Nuclear services · Equipment supply · 10 CFR 50.69
We keep nuclear plants safe, reliable, and sustainable.
Nearly four decades supporting the global nuclear industry — turnkey 10 CFR 50.69 implementation, equipment supply, and the engineering muscle to deliver.
10 CFR 50.69 Implementation
• The industry standard for turnkey, integrated 50.69 Implementation — LAR, Categorization, Procurement Alternative Treatments, Programmatic Alternative Treatments (IST, ISI, EQ, Appendix J, Maintenance Rule, etc.), and RISC-3 equipment and component delivery.
• Millions in cost savings, lead time reductions, obsolescence solutions, and outage scope eliminations, with maximum focus on the high-safety significant topics.
• Complete 50.69 support. Turnkey implementation. Proven results.
Ask about 50.69 →Equipment Supply
• Mechanical
• Electrical
• Instrumentation & Controls
• Construction Materials
• Chemicals & Commodities
• Turnkey procurement and delivery, including ISO-certified Parts Quality Initiative (PQI) inspection and testing per INPO IER 21-4
• All backed by a deep supplier network delivering to nuclear standards
Source a component →Nuclear Services
• Engineering & Licensed SRO Staff
• Project Management
• Major Projects & Upgrades
• Regulatory & Licensing Support
• Power Uprate Support
• Procurement Engineering
• Supply Chain Management
• Staff Augmentation
• PM & SFCP Optimization
Build your team →Two SaaS platforms
Software built by nuclear people, for nuclear plants.
Edwin · AI-powered PM optimization
Decades of maintenance history, with every reduction defensible.
Edwin reads your plant's maintenance change history and surfaces PM reductions, reversals, and frequency extensions — with the evidence to defend every recommendation. Revolutionary effectiveness with proven results. Data is secured to the highest standards in AWS GovCloud (US).
FSN · The 50.69 platform
Fifty-Sixty-Nine – Your entire 50.69 program managed end-to-end.
FSN is the digital home of the 50.69 program — RISC-3 Categorization, Alternative Treatments, and Periodic Review Preparation, all in one. Designed to enhance visibility of your 50.69 program, simplify your management tasks, and maximize your total implementation value.
Contact us
Have a question or comment? Please let us know, and a member of our team will get back to you promptly.
Message sent
Thank you for contacting Eagle Rushmore. Your inquiry has been routed for team member review.